SciFi Futures
← Concepts
Social & Economic Systems

Ecumenopolis

A planet whose entire land surface is one continuous city, housing tens of billions in sealed levels and importing every calorie it eats.

In shortEcumenopolis, from Foundation (Isaac Asimov, 1951), is at technology readiness level 4 of 9 (validated in lab) at its weakest link. Held back by Indoor production of staple crops. Science status: underlying science well understood; an engineering problem. Estimated new funding to unlock: $5.3B–37B.

Trantor's 75,000,000 square miles of land surface are 'a single city' tunnelled over a mile down and extending into the sub-ocean soil, with a population well in excess of forty billion under a continuous metal skin - 'no green, no soil, no life other than man'. Fleets in the tens of thousands land daily with the produce of twenty agricultural worlds, and Gaal is told that the temperature difference between ground level and a couple of miles down supplies all the energy the city needs, more cheaply than atomic generators.
Foundation by Isaac Asimov, 1951

Closest todayThe closest real analogues are megatall buildings and arcology proposals - Jeddah Tower, NEOM's scaled-back The Line - plus district cooling and geothermal heat exchange. Indoor staple-crop farming, the technology Trantor's twenty granary worlds stand in for, remains a laboratory result that every published analysis finds uneconomic.

Dependency stack

Research TRL 1–3Development TRL 4–6Deployment TRL 7–9
Sort by
  • A planet-city either imports every calorie, as Trantor does from twenty worlds, or grows staples indoors
    • Lighting energy dominates cost; wheat and soy are among the most energy-intensive crops to grow indoors
    • Capital cost per square metre of growing area has sunk a string of well-funded operators
    • Harvest index and grain weight fall short of simulated potential, pointing to unresolved source-sink limits
    • Heat rejection and dehumidification loads scale with lighting and must be removed from a sealed building
    TRL 4
    • Water, nutrient and CO2 recycling inside a sealed building is the same problem as a closed habitat
      ✕2 blockers›
      • Food production closure
      • Microbial and ecological stability over years
      TRL 5
    • Every watt of grow light becomes heat that must leave the building, and radiative panels cut the cooling load
      ✕4 blockers›
      • Net cooling power is limited to roughly 40-100 W/m2, so useful duty requires large areas
      • Atmospheric water vapour closes the transparency window, cutting performance in humid regions
      • Soiling and UV ageing degrade the optical stack, and long-term field durability data is thin
      • Convective heat gain must be suppressed with infrared-transparent covers, which add cost
      TRL 8
  • Trantor is one continuous structure; the engineering problem is structure, ventilation and egress for billions in a single building
    ✕3 blockers›
    • Fire safety and evacuation for >100,000 occupants in one structure
    • Daylight and ventilation for deep floor plates
    • Vertical transport capacity and core area at extreme heights
    TRL 7
    • Rope-hoist elevators consume core area and limit travel height
      ✕2 blockers›
      • Safety certification of rope-free braking and multi-car control
      • Linear-motor power and cost per metre of shaft
      TRL 6
  • Air, water and waste for forty billion people under a sealed skin is closed-loop life support at planetary scale
    TRL 5
  • Movement in a city a mile deep is mostly vertical, which rope-driven elevators cannot serve
    TRL 6
  • Every watt a sealed city consumes becomes heat it must radiate; Trantor's metal skin is also its radiator
    TRL 8

Who could unlock it

  • Across several requirements:
  • KONE UltraRope 2
Indoor production of staple cropsTRL 4bottleneck
  • Senthold AssengResearcher, Technical University of Munich
    Led the 2020 PNAS indoor wheat yield analysis and the subsequent climate-chamber experiments that set current indoor grain benchmarks
  • Evan MillsResearcher, Lawrence Berkeley National Laboratory (formerly)
    Published the 2025 meta-analysis of controlled-environment agriculture energy use, finding staple crops uneconomic even with LEDs
  • AeroFarmsCompany
    One of the few indoor operators to reach sustained profitability, by confining itself to microgreens rather than staples
Closed-loop life supportTRL 5
  • NASA ISS ECLSSProgram
    ISS water recovery reached 98% in 2023 after the Brine Processor Assembly was added; oxygen-loop closure is still the main gap
  • Paragon Space Development CorporationCompany
    Its Brine Processor Assembly raised ISS water-loop closure from 93% to over 98% and passed 3 years on orbit in 2024
  • ESA MELiSSAProgram
    Decades-long European bioregenerative loop program; the Barcelona pilot plant reported gas and liquid interconnection of four compartments in 2025
  • Francesc GòdiaResearcher, Universitat Autònoma de Barcelona
    Leads the MELiSSA Pilot Plant, which runs the full biological loop continuously with a rat crew stand-in
Ropeless multi-car vertical transportTRL 6
  • TK Elevator MULTICompany
    Linear-motor, multi-car ropeless system with 90-degree shaft changes; a prototype still runs in the Rottweil tower, with no confirmed commercial installation as of 2025
  • TK Elevator Rottweil test towerCompany
    246 m test tower (opened 2017) with shafts for MULTI and high-speed elevator validation; TKE was still hiring for MULTI prototype work in 2025
  • Sabanci University linear-motor elevator groupAcademic lab
    Built a full-scale linear-motor elevator lab prototype and cable-free car position sensing (2013)
  • KONE UltraRopeCompany
    Carbon-fibre hoist rope extending single-run roped elevators to ~1 km (Jeddah Tower), the main competing approach to the rope-length limit
Megatall and megastructure building engineeringTRL 7
  • Adrian Smith + Gordon Gill ArchitectureCompany
    Architect of the ~1,008 m Jeddah Tower, past floor 118 in Oct 2026 and targeted for late 2028
  • Thornton TomasettiCompany
    Structural engineer of Jeddah Tower, designing a buttressed core for kilometer height
  • Saudi Binladin GroupCompany
    Main contractor; signed a SAR 7.2B (~$1.9B) completion contract for Jeddah Tower in Oct 2024
  • William F. BakerResearcher, Skidmore, Owings & Merrill
    Structural engineer behind Burj Khalifa's buttressed-core system, the basis for km-class towers

Beyond engineering

  • Total dependence on imported food, which Asimov made the cause of Trantor's fall by siege
  • Governance and policing of a single administrative structure containing tens of billions
  • Financing and ownership of a structure that is simultaneously a city and a single asset
  • Loss of any natural environment, and whether populations tolerate it