Megatall and megastructure building engineering
Designing and constructing single habitable structures of ~1 km height or multi-km footprint housing 10^5 people, with safe egress, ventilation and wind response.
State of the art
Jeddah Tower reached level 118 (~474 m) of a planned >1,000 m in October 2026 after construction resumed in 2025.
- Fire safety and evacuation for >100,000 occupants in one structure
- Daylight and ventilation for deep floor plates
- Vertical transport capacity and core area at extreme heights
Who’s working on it
- Adrian Smith + Gordon Gill ArchitectureCompany
Architect of the ~1,008 m Jeddah Tower, past floor 118 in Oct 2026 and targeted for late 2028
- Thornton TomasettiCompany
Structural engineer of Jeddah Tower, designing a buttressed core for kilometer height
- Saudi Binladin GroupCompany
Main contractor; signed a SAR 7.2B (~$1.9B) completion contract for Jeddah Tower in Oct 2024
- William F. BakerResearcherSkidmore, Owings & Merrill
Structural engineer behind Burj Khalifa's buttressed-core system, the basis for km-class towers
- Council on Tall Buildings and Urban Habitat ↗Academic lab
Research body that sets height standards and studies supertall egress, wind and vertical transport
- KONE UltraRopeCompany
Carbon-fibre hoist rope enabling ~1 km single-run elevators, chosen for Jeddah Tower
What to invest in
| Kind | Investment | Scale |
|---|---|---|
| research | Egress, smoke-control and code development for city-scale single structures | $$ $10M – $100M |
Depends on
Required by
No other capability builds on this directly.