SciFi Futures

Method

The dataset is a directed graph. Works (novels) depict concepts (sci-fi technologies). Concepts require capabilities: real, ownable pieces of science and engineering. Capabilities require other capabilities. Each capability is assessed exactly once and reused everywhere it appears, so one change ripples through every concept that depends on it.

Readiness: the weakest link

A concept’s readiness is the lowest TRL among every capability reachable through its critical and major requirements. A system is only as ready as its least-ready dependency. The capabilities sitting at that minimum are its bottlenecks. Supporting requirements are traced but don’t gate.

  1. TRL 1
    Basic principles observed
  2. TRL 2
    Technology concept formulated
  3. TRL 3
    Experimental proof of concept
  4. TRL 4
    Validated in lab
  5. TRL 5
    Validated in relevant environment
  6. TRL 6
    Demonstrated in relevant environment
  7. TRL 7
    Prototype demonstrated in operational environment
  8. TRL 8
    System complete and qualified
  9. TRL 9
    Proven in operational use

Science status

Separate from TRL. FTL travel and a fusion reactor might both sit at a low TRL, but only one of them is an engineering problem.

  • Established scienceUnderlying science well understood; an engineering problem
  • Plausible scienceConsistent with known physics; key effects unproven at scale
  • Speculative scienceRequires unconfirmed physics or an open scientific question with no known path to answer
  • Contradicts known physicsContradicts well-established physics as currently understood

Investment priority

priority = (3 × concepts gated + concepts fed)
         × (9 − TRL) / 8              // already-mature capabilities need less push
         × physics tractability   // established 1, plausible 0.8, speculative 0.25, forbidden 0

Investment scales estimate the cost to advance a capability about two TRLs: $ < $10M, $$ $10M – $100M, $$$ $100M – $1B, $$$$ > $1B.

Funding to unlock and who’s working on it

Each capability carries a rough range for the new money needed to bring it to its target readiness (usually TRL 8), anchored on what comparable real programs actually cost, such as the Human Genome Project, ITER, JWST or recent venture rounds. For capabilities that rest on open science, the range prices the research needed to settle the question, not the technology itself. Nothing is priced where known physics rules it out. A concept’s total adds up its critical and major capabilities still below TRL 8; shared capabilities count toward every concept that needs them, so totals across concepts overlap. The researchers, labs, companies and programs listed are the ones leading the work today, as of the research date. Treat both as starting points, not due diligence.

Timeline verdicts

Each appearance can record the in-story year the technology is shown in use. If a real version is in operational use, the arrival year is compared with the story’s year. Otherwise, past dates are overdue. For future dates, the years left are divided by the TRL steps the weakest link still needs to reach TRL 8: 5+ years per step is on track, 2.5–5 is tight, and under 2.5 is not by then. Concepts that need new science or contradict physics are labeled as such whatever the date. This is a rule of thumb for comparison, not a forecast.

Layers

  • Foundational science
  • Materials
  • Component technology
  • Integrated system
  • Infrastructure & scale