SciFi Futures
← Concepts
Social & Economic Systems

Arcology

A single self-contained megastructure housing a city's population, with homes, work, shops and services inside one building.

In shortArcology, from Oath of Fealty (Larry Niven and Jerry Pournelle, 1981), is at technology readiness level 6 of 9 (demonstrated in relevant environment) at its weakest link. Held back by Ropeless multi-car vertical transport. Science status: underlying science well understood; an engineering problem. Estimated new funding to unlock: $2.3B–22B.

Todos Santos, a two-mile-square, thousand-foot-tall arcology in Los Angeles, houses a quarter-million people under its own security and governance.
Oath of Fealty by Larry Niven and Jerry Pournelle, 1981

Closest todayJeddah Tower (1 km, under construction); NEOM's The Line (scaled back 2025); Paolo Soleri's Arcosanti prototype.

Dependency stack

Research TRL 1–3Development TRL 4–6Deployment TRL 7–9
Sort by
  • Structure, fire safety and egress for >100,000 occupants in one building
    ✕3 blockers›
    • Fire safety and evacuation for >100,000 occupants in one structure
    • Daylight and ventilation for deep floor plates
    • Vertical transport capacity and core area at extreme heights
    TRL 7
    • Rope-hoist elevators consume core area and limit travel height
      • Safety certification of rope-free braking and multi-car control
      • Linear-motor power and cost per metre of shaft
      TRL 6
  • Moving a city's population vertically and horizontally within the structure
    TRL 6
  • Building-scale water and waste recycling reduces dependence on the surrounding city
    ✕2 blockers›
    • Food production closure
    • Microbial and ecological stability over years
    TRL 5

Who could unlock it

  • Across several requirements:
  • KONE UltraRope 2
Ropeless multi-car vertical transportTRL 6bottleneck
  • TK Elevator MULTICompany
    Linear-motor, multi-car ropeless system with 90-degree shaft changes; a prototype still runs in the Rottweil tower, with no confirmed commercial installation as of 2025
  • TK Elevator Rottweil test towerCompany
    246 m test tower (opened 2017) with shafts for MULTI and high-speed elevator validation; TKE was still hiring for MULTI prototype work in 2025
  • Sabanci University linear-motor elevator groupAcademic lab
    Built a full-scale linear-motor elevator lab prototype and cable-free car position sensing (2013)
  • KONE UltraRopeCompany
    Carbon-fibre hoist rope extending single-run roped elevators to ~1 km (Jeddah Tower), the main competing approach to the rope-length limit
Megatall and megastructure building engineeringTRL 7
  • Adrian Smith + Gordon Gill ArchitectureCompany
    Architect of the ~1,008 m Jeddah Tower, past floor 118 in Oct 2026 and targeted for late 2028
  • Thornton TomasettiCompany
    Structural engineer of Jeddah Tower, designing a buttressed core for kilometer height
  • Saudi Binladin GroupCompany
    Main contractor; signed a SAR 7.2B (~$1.9B) completion contract for Jeddah Tower in Oct 2024
  • William F. BakerResearcher, Skidmore, Owings & Merrill
    Structural engineer behind Burj Khalifa's buttressed-core system, the basis for km-class towers

Beyond engineering

  • Private governance and security within a city-sized building
  • Financing and zoning for a single trillion-scale asset