Social & Economic Systems
Arcology
A single self-contained megastructure housing a city's population, with homes, work, shops and services inside one building.
In shortArcology, from Oath of Fealty (Larry Niven and Jerry Pournelle, 1981), is at technology readiness level 6 of 9 (demonstrated in relevant environment) at its weakest link. Held back by Ropeless multi-car vertical transport. Science status: underlying science well understood; an engineering problem. Estimated new funding to unlock: $2.3B–22B.
Todos Santos, a two-mile-square, thousand-foot-tall arcology in Los Angeles, houses a quarter-million people under its own security and governance.
Closest todayJeddah Tower (1 km, under construction); NEOM's The Line (scaled back 2025); Paolo Soleri's Arcosanti prototype.
Dependency stack
Research TRL 1–3Development TRL 4–6Deployment TRL 7–9
Sort by
- Structure, fire safety and egress for >100,000 occupants in one building
✕3 blockers›
- Fire safety and evacuation for >100,000 occupants in one structure
- Daylight and ventilation for deep floor plates
- Vertical transport capacity and core area at extreme heights
TRL 7- Ropeless multi-car vertical transportbottleneckRope-hoist elevators consume core area and limit travel height
- Safety certification of rope-free braking and multi-car control
- Linear-motor power and cost per metre of shaft
TRL 6
- Moving a city's population vertically and horizontally within the structureTRL 6
- supportingClosed-loop life supportBuilding-scale water and waste recycling reduces dependence on the surrounding city
✕2 blockers›
- Food production closure
- Microbial and ecological stability over years
TRL 5
Who could unlock it
- Across several requirements:
- KONE UltraRope 2
Ropeless multi-car vertical transportTRL 6bottleneck
- TK Elevator MULTICompanyLinear-motor, multi-car ropeless system with 90-degree shaft changes; a prototype still runs in the Rottweil tower, with no confirmed commercial installation as of 2025
- TK Elevator Rottweil test towerCompany246 m test tower (opened 2017) with shafts for MULTI and high-speed elevator validation; TKE was still hiring for MULTI prototype work in 2025
- Sabanci University linear-motor elevator groupAcademic labBuilt a full-scale linear-motor elevator lab prototype and cable-free car position sensing (2013)
- KONE UltraRopeCompanyCarbon-fibre hoist rope extending single-run roped elevators to ~1 km (Jeddah Tower), the main competing approach to the rope-length limit
Megatall and megastructure building engineeringTRL 7
- Adrian Smith + Gordon Gill ArchitectureCompanyArchitect of the ~1,008 m Jeddah Tower, past floor 118 in Oct 2026 and targeted for late 2028
- Thornton TomasettiCompanyStructural engineer of Jeddah Tower, designing a buttressed core for kilometer height
- Saudi Binladin GroupCompanyMain contractor; signed a SAR 7.2B (~$1.9B) completion contract for Jeddah Tower in Oct 2024
- William F. BakerResearcher, Skidmore, Owings & MerrillStructural engineer behind Burj Khalifa's buttressed-core system, the basis for km-class towers
Beyond engineering
- Private governance and security within a city-sized building
- Financing and zoning for a single trillion-scale asset