Industrial helium-3 supply
Harvesting helium-3 at tonne-per-year scale, realistically from lunar regolith, to fuel D–He3 fusion engines and reactors.
State of the art
Interlune unveiled a full-scale excavator prototype (2025) and holds ~$500M of He-3 offtake agreements; first lunar prospecting payload targeted ~2027.
- Roughly 100,000–1,000,000 t of regolith must be processed per kg of He-3
- Unknown He-3 concentration and depth distribution at candidate sites
- Autonomous lunar excavation reliability in abrasive dust
Who’s working on it
- Interlune ↗Startup
Unveiled a full-scale 100 t/h excavator in 2025, holds about $500M of binding He-3 purchase agreements, and produced 99% pure He-3 from terrestrial helium with its Cold Capture system in Jul 2026
- Vermeer CorporationCompany
Co-developed Interlune's full-scale lunar excavator prototype (May 2025) and expanded the partnership in Jul 2026
- U.S. DOE Isotope ProgramProgram
Agreed in May 2025 to buy 3 liters of lunar helium-3 from Interlune, for delivery by April 2029
- Black Moon EnergyStartup
Houston prospective He-3 miner; its CEO reported about $500M of He-3 contracts with DOE and fusion companies (2026)
- AstrolabStartup
Showed its FLEX lunar rover integrated with Interlune excavation hardware (Mar 2026)
- Jarrett DillenburgerResearcherEuropean Space Resources Innovation Centre
Regolith-processing researcher who has named lunar-night survival as a key unsolved barrier for harvesters (2026)
What to invest in
| Kind | Investment | Scale |
|---|---|---|
| engineering | Lunar prospecting missions that map He-3 grade and demonstrate in-situ extraction | $$ $10M – $100M |
| infrastructure | Pilot lunar harvester fleet returning first kilograms to Earth | $$$$ > $1B |