Long-range wireless power beaming
Transmitting useful electric power over kilometres to thousands of kilometres via phased microwave arrays or lasers into rectennas or PV receivers.
State of the art
DARPA POWER PRAD delivered >800 W over 8.6 km by laser (2025); Caltech MAPLE beamed microwave power in orbit and to a ground receiver (2023).
- End-to-end DC-to-DC link efficiency (MAPLE 6%) must reach >50% for economic grid power
- Rectenna areas of several km for GEO-to-ground microwave links
- Beam-pointing safety interlocks and spectrum allocation at gigawatt scale
Who’s working on it
- DARPA POWER ↗Program
PRAD tests (2025) at White Sands delivered >800 W over 8.6 km by laser for 30 s, beating the previous 230 W at 1.7 km record.
- Paul JaffeResearcherDARPA (formerly US Naval Research Laboratory)
POWER program manager; earlier led NRL's PRAM power-beaming module flown on the X-37B (2020).
- PowerLight Technologies ↗Startup
Laser power-beaming firm that has demonstrated ~400 W over 1 km sustained for hours and builds systems for DoD drone and relay programs.
- Teravec TechnologiesCompany
Built the photovoltaic receiver used in DARPA's 2025 PRAD 8.6 km record.
- Ali HajimiriResearcherCaltech
His MAPLE flexible phased-array transmitter beamed microwave power in orbit and to a ground receiver in 2023.
- AetherfluxStartup
Raised $50M (2025) for a 2026 in-orbit infrared laser power-beaming demonstration with a ~10 m ground spot.
What to invest in
| Kind | Investment | Scale |
|---|---|---|
| engineering | 100 kW-class orbit-to-ground demonstration with a 100 m+ rectenna | $$$ $100M – $1B |
| research | High-efficiency GaN/CMOS power amplifiers and rectifiers for 5.8 GHz and higher bands | $$ $10M – $100M |
Depends on
A root node: no prerequisites modeled.