Seafloor mineral collection and riser lift
Tracked collector vehicles working at 4-6 km depth and a riser-and-airlift system that carries ore continuously to a surface production vessel.
State of the art
In November 2022, NORI and Allseas collected about 4,500 wet tonnes of polymetallic nodules and lifted over 3,000 tonnes up a 4.3 km riser to the Hidden Gem, driving the collector 80 km across the seafloor at a sustained 86.4 t/h; Japan's drillship Chikyu recovered about 50 tonnes of rare-earth mud from 5,569 m in February 2026, with a 350 t/day month-long trial planned for February 2027.
- Commercial rates require over 200 t/h, more than double the demonstrated pilot rate, with multiple collector heads and a wider riser
- Riser dynamics, wear and blockage over months of continuous operation are untested
- Collector traction and manoeuvring on soft abyssal sediment limit coverage and leave persistent tracks
- Dewatering and discharge of the lifted water column must meet thresholds that are not yet set
Who’s working on it
- Allseas ↗Company
Built and operated the pilot nodule collection and 4.3 km riser system on the Hidden Gem; signed a development and commercial production contract in May 2026 for a 3 Mt/y system
- The Metals Company ↗Company
Holds the NORI and TOML exploration areas and filed the first US commercial recovery application for polymetallic nodules; targeting offshore commissioning in late 2027
- JAMSTEC ↗Government lab
Ran the Chikyu rare-earth mud lift from 5,569 m in 2026 under Japan's Cabinet Office SIP programme, with full-scale trials planned for 2027
What to invest in
| Kind | Investment | Scale |
|---|---|---|
| engineering | Commercial collector and riser system at 3 million wet tonnes a year, with redundancy for continuous operation | $$$ $100M – $1B |
| engineering | Integrated dewatering, discharge treatment and in-line monitoring on the production vessel | $$ $10M – $100M |
Depends on
A root node: no prerequisites modeled.
Required by
No other capability builds on this directly.