Regolith-based construction
Robotically sintering, melting or binding local regolith into pads, walls, shielding berms and pressurizable structures on the Moon or Mars.
State of the art
ICON's NASA-funded Olympus system (contract to 2028) and Duneflow lunar-g regolith experiment (2025); REACT targets TRL 6 in vacuum.
- Sintering/melting power and abrasive dust on moving parts
- Unknown strength of in-situ material under thermal cycling and vacuum
- Pressure-retaining structures still need imported liners
Who’s working on it
- ICONStartup
Developing the laser-melting Olympus lunar construction system under a $57.2M NASA SBIR Phase III running to 2028; flew the Duneflow lunar-gravity regolith experiment in Feb 2025
- NASA MMPACTProgram
Marshall-led Moon to Mars Planetary Autonomous Construction Technologies project testing 3D-printed landing pads and shielding from simulant
Building regolith-stabilized roads and pads with Michigan Tech under NASA STTR; started a NASA Langley SBIR in Oct 2026 on burying inflatable habitats under 2 m of regolith
- Korea Institute of Civil Engineering and Building TechnologyGovernment lab
Produced what it calls the largest uniformly microwave-sintered lunar-simulant bricks (2024)
- Deep Space Exploration LaboratoryGovernment lab
Hefei lab built a solar-concentrator lunar brick-printing machine (2025) ahead of a Chang'e-8 in-situ brick test planned for 2028
- Zhou ChengResearcherHuazhong University of Science and Technology
Leads the simulated lunar-soil bricks sent to China's space station on Tianzhou-8 for 3-year exposure tests (2024)
What to invest in
| Kind | Investment | Scale |
|---|---|---|
| engineering | CLPS-delivered demo printing a landing pad section on the Moon | $$$ $100M – $1B |
Depends on
Required by
No other capability builds on this directly.