Supply of power-grade radioisotopes
Reactor and accelerator capacity to make the kilogram quantities of plutonium-238, nickel-63 or tritium that nuclear batteries and heat sources consume, plus the handling chain around them.
State of the art
Oak Ridge shipped 550 g of plutonium-238 in 2023, the first production-quantity shipment in three decades, against a target of 1.5 kg a year by 2026, with irradiation in the High Flux Isotope Reactor and the Advanced Test Reactor; City Labs reports having secured tritium fuel from US and international sources to produce batteries and heater units at scale.
- Plutonium-238 production depends on two ageing research reactors and a neptunium-237 feedstock inventory
- Nickel-63 requires enriched nickel-62 targets and reactor irradiation, with almost no civil capacity outside Russia and China
- Tritium supply is tied to heavy-water reactor byproduct streams and fusion research demand
- Transport, licensing and end-of-life recovery of isotope-bearing consumer devices have no established framework
Who’s working on it
- Oak Ridge National LaboratoryGovernment lab
Restarted US plutonium-238 production in 2015, shipped 550 g in 2023 and targets 1.5 kg a year; supplies fuel for NASA's radioisotope power systems
- Idaho National LaboratoryGovernment lab
Stores the neptunium-237 feedstock, irradiates targets in the Advanced Test Reactor and assembles radioisotope generators
The anchor customer that funded the production restart; its generators have flown on over 25 missions, most recently Perseverance and Dragonfly
What to invest in
| Kind | Investment | Scale |
|---|---|---|
| infrastructure | Dedicated irradiation and separation capacity for power isotopes, decoupled from the research reactors now used | $$$ $100M – $1B |
| policy | Licensing, transport and recovery rules for isotope-powered devices outside the space and medical sectors | $ < $10M |
Depends on
A root node: no prerequisites modeled.