SciFi Futures
← Capabilities
Energy/Infrastructure & scale

Supply of power-grade radioisotopes

Reactor and accelerator capacity to make the kilogram quantities of plutonium-238, nickel-63 or tritium that nuclear batteries and heat sources consume, plus the handling chain around them.

State of the art

Oak Ridge shipped 550 g of plutonium-238 in 2023, the first production-quantity shipment in three decades, against a target of 1.5 kg a year by 2026, with irradiation in the High Flux Isotope Reactor and the Advanced Test Reactor; City Labs reports having secured tritium fuel from US and international sources to produce batteries and heater units at scale.

What’s blocking it
  • Plutonium-238 production depends on two ageing research reactors and a neptunium-237 feedstock inventory
  • Nickel-63 requires enriched nickel-62 targets and reactor irradiation, with almost no civil capacity outside Russia and China
  • Tritium supply is tied to heavy-water reactor byproduct streams and fusion research demand
  • Transport, licensing and end-of-life recovery of isotope-bearing consumer devices have no established framework

Who’s working on it

  • Oak Ridge National LaboratoryGovernment lab

    Restarted US plutonium-238 production in 2015, shipped 550 g in 2023 and targets 1.5 kg a year; supplies fuel for NASA's radioisotope power systems

  • Idaho National LaboratoryGovernment lab

    Stores the neptunium-237 feedstock, irradiates targets in the Advanced Test Reactor and assembles radioisotope generators

  • The anchor customer that funded the production restart; its generators have flown on over 25 missions, most recently Perseverance and Dragonfly

What to invest in

KindInvestmentScale
infrastructureDedicated irradiation and separation capacity for power isotopes, decoupled from the research reactors now used$$$ $100M – $1B
policyLicensing, transport and recovery rules for isotope-powered devices outside the space and medical sectors$ < $10M

Sci-fi concepts in reach

Pocket nuclear batterydirect

Sources