Kilometre-scale ensemble weather forecasting
Operational forecasts at 1-5 km grid spacing with large ensembles, resolving individual storms well enough to say how a specific rainband or cyclone would have behaved unperturbed.
State of the art
ECMWF put the machine-learning AIFS into operations in February 2025 and its 51-member AI ensemble in July 2025, with 5-15% medium-range error reductions and substantially better tropical cyclone tracks; its Destination Earth digital twin runs a continuous global model at 4.4 km, and Japan's operational 1 km local model entered service at the end of FY2025.
- Convection-permitting ensembles of 100-plus members are still research-scale in cost
- Machine-learning models inherit a weak-intensity bias for tropical cyclones and cannot extrapolate beyond their training climate
- Observations below 500 m altitude are sparse, which limits data assimilation for the boundary layer where interventions act
- Chaotic growth caps useful attribution to roughly 6-24 hours for a given intervention
Who’s working on it
- ECMWF ↗Program
Runs the 9 km IFS, the operational AIFS machine-learning model and ensemble, and the 4.4 km Destination Earth Extremes digital twin
- Takemasa MiyoshiResearcherRIKEN Center for Computational Science
Leads data assimilation work underlying control simulation experiments and directs Japan's Moonshot Goal 8 weather control programme
- Japan Meteorological AgencyGovernment lab
Moved a 1 km-grid local prediction model into operational service at the end of FY2025, the resolution needed for rainband-scale decisions
What to invest in
| Kind | Investment | Scale |
|---|---|---|
| research | Hybrid physics and machine-learning ensembles at kilometre scale with assimilation of drone and radar observations in the boundary layer | $$$ $100M – $1B |
| infrastructure | Exascale compute dedicated to very large convective-scale ensembles | $$$ $100M – $1B |